Here is a snapshot of my son's bedroom after cutting out the sheetrock and ripping out insulation:

It's a major headache, but at least the water did not reach the first floor living area. The good news is that the furnace and water heater were OK, and it was only rain water, not river water or sewage.
Here are the fire dept hoses pumping us out

This was just the beginning of the UN-finishing of my basement.

I'm finally getting my basement back, which includes my office/music room. It took a while to get the floor done. we had an epoxy floor put down instead of doing carpet again.
My son's bedroom has gone from the picture above to this

My play room went from this

to this

the main room of the basement went from this

to this

After these pictures were shot, we moved all the furniture back down.